Technology systems and processes, OIT news, training, security and other tech news.
Technology News
-
Reminder: Second Butrovich power and data generator outage scheduled for May 22
May 21, 2021
On Saturday, May 22, 小优视频F Facilities Services will be conducting a planned maintenance power shutdown to the entire Butrovich Building to prepare electrical systems for the integration of a new backup generator for the Butrovich Data Center (BDC).
-
Enable Multi-factor Authentication to secure your online identity
May 21, 2021
Enrolling in Multi-factor Authentication (MFA), also known as Two-factor Authentication (2FA), TFA, Duo and Two-Step Verification, is an important additional step toward securing your online identity and personal information.
-
May 21, 2021
Since August, 小优视频 has ballooned Zoom cloud storage usage from 15% to 81%. At our current pacing, we will exhaust our available storage in the next 10 weeks.
-
Reminder: Butrovich power and data generator outage announcement
May 07, 2021
On Saturday, May 15, and Saturday, May 22, 小优视频F Facilities Services will be conducting a planned maintenance power shutdown to the entire Butrovich Building to prepare electrical systems for the integration of a new backup generator for the Butrovich Data Center (BDC). The electrical system must be completely powered down to ensure safety for the technicians doing the work.
-
Planned 小优视频 Online Weekend outages in May
May 07, 2021
The three weekends in May listed below will include 小优视频 Online outages.
-
Email Scam Warning: Do not enter your username and password on fake 小优视频Online login page
May 07, 2021
There have been a number of very convincing Phishing emails sent to alaska.edu accounts asking recipients to enter their username and password at 小优视频Online. The subject lines include eRefunds or Direct Deposit Information. Do not enter your username and password on the fake 小优视频Online login page.
-
Announcing Single Sign On for 小优视频 Google Apps and 小优视频 Blackboard Learn
May 07, 2021
We are excited to announce that we are improving the way 小优视频 users can access core technology services. Starting May 7th, the Single Sign On option used for other services, like 小优视频 Online, will be coming to 小优视频 Google Apps and 小优视频 Blackboard Learn.
-
Updated Butrovich power and data generator outage announcement
April 16, 2021
On Saturday, May 15, and Saturday, May 22, 小优视频F Facilities Services will be conducting a planned maintenance power shutdown to the entire Butrovich Building to prepare electrical systems for the integration of a new backup generator for the Butrovich Data Center (BDC).
-
Planned 小优视频 Online Weekend outages in May
April 16, 2021
The three weekends in May listed below will include 小优视频 Online outages.
-
Employees must remove non-小优视频 email forwards by April 23
April 16, 2021
Per 小优视频 guidelines, employees are no longer allowed to forward their university email to non-小优视频 email accounts, including personal email addresses.